Since we subcontract the majority of our work, we’re always looking for new talent and suppliers. If you’re interested in working with us, download and complete the Pre-Qualification Form. That way we’ll have you in our database and can notify you when bid opportunities arise.
Here are some forms to help you out
If you’re already on our supplier list, we invite you to bid on any of the jobs below. Don’t see any bid opportunities? Check in again—we’re constantly updating the list.
| Bid Due | Project Name | Description | ||
|---|---|---|---|---|
Nov 18 |
Sunrise Estates Phases 1 & 2 Re-Bid Drawings and Specs |
Project Address: The Dalles, OR Work Summary: Plan All Plans are available for viewing and copying via the links to the left. |
||
November 21th, 5:00PM |
Juniper Gardens Apartments Drawings and Specs |
Project Address: 2718 Juniper Street, Forest Grove, Oregon Work Summary: Juniper Gardens Apartments The project consists of the construction of a 24 unit multi-family housing project and associated site improvements on a 2.3 acre site. Includes (6) 4-plex living unit buildings, a community building, parking lot, new public sidewalks, landscaping and site improvements. Spec Sections Included : DIV 2: Site clearing, select demo, excavation, shoring & underpinning, grading, AC Paving, site utilities, concrete paving, gas distribution, site furnishings, playground equip, landscaping & irrigation. DIV 3: Concrete & reinforcing. DIV 4: Masonry. DIV 5: Metal fabrications. DIV 6: Pre-fab joists & beams, Glu-Lam beams, Pre-fab trusses, rough carpentry, finish carpentry, custom cabinetry. DIV 7: WRB, insulation, asphalt shingles, wood siding, flashing & sheet metal, plastic roof panels, joint sealants. DIV 8: Steel doors & frames, wood doors, fiberglas doors, alum storefront, vinyl windows, hardware, glazing. DIV 9: Portland cement plaster, gyp board, resilient flooring, carpet, floor matting, painting. DIV 10: Louvers, vents & grills, identifying plaques, fire extinguishers, toilet accessories. DIV 11: Appliances. DIV 12: Window coverings. DIV 15: HVAC, plumbing, fire suppression, testing & balancing, natural gas distibution. DIV 16: Electrical, lighting, fire detection & alarm, low voltage Instructions : Provide an itemized cost breakdown for your scope of work. Bid all work per plans and specifications. Substitution requests due no later than November 16th and must be on the appropriate form included in the specification manual. It is the subcontractor's responsibility to include all back up documentation for all substitution requests. Prevailing Wages : Project is subject to Residential Davis-Bacon Prevailing Wages for Washington County, Oregon. Effective date: October 14, 2011. See specification section 00826 for prevailing wage rates. Bidders are to acknowledge on their bid form that pricing includes prevailing wages. Project Contact: Scott Dekker Plan All Plans are available for viewing and copying via the links to the left. |